WHAT IS DIFFERENCE BETWEEN FIT OUT APPROVAL AND RENOVATION APPROVAL

Even the smallest change to your Dubai property, whether it’s knocking down a wall or updating interiors,requires DM Approval

This isn’t just bureaucracy; it’s a guarantee that your renovation aligns with Dubai’s building codes, fire safety regulations, and structural standards. Skipping this step could cost you fines, delays, or even legal trouble.

In this article, we’ll break down the difference between Fit Out Approval and Renovation Approval, explain how each impacts your project’s scope and structure, and outline the essential documents and engineering plans you need to secure approval efficiently and without setbacks

Contact Us Now!

Your Project, Our Priority: Fast & Reliable Approvals

📞 WhatsApp

Table of Contents

What is Differnce Between Fitout Approvals And Revovation Approvals?

The fundamental difference between fit out approvals and renovation approvals lies in the scope of work, the degree of impact on the existing structure, and the resulting complexity of the engineering blueprints.

Fitout approval are permissions designated for interior finishing works within a raw (shell and core) unit. They encompass preparing the space without any structural impact on the building. Consequently, these projects are handled through simple finishing permits that rely solely on interior plans, such as interior design drawings.

Conversely, a dubai renovation approval is dedicated to modifying or updating an existing space. This scope may extend to changes that affect the building’s elements or redistribute the area, such as adding a balcony.
Because it has a greater potential impact on the structure, this type of work necessitates accredited modification or building permits and more detailed engineering drawings, including structural plans.

Here is a table summarizing the main differences between a renovation permit and a fitout permits:

CriterionFITOUT APPROVALRENOVATION PERMIT
Scope of WorkInternal finishing and preparation works inside a raw or existing unit.Modifying an existing space.
Degree of Impact on the BuildingDoes not affect the structure.May affect the structure.
Required DrawingsArchitectural, Electromechanical, Structural.Architectural, mostly.

Unlock your project’s full potential—start by mastering the DCD Fitout Approval Requirements in Dubai and move confidently from design to approval.

1. What is the difference between the scope of work for a Fit Out Approval and a Renovation Approval?

The difference between the scope of a fit-out approval and a renovation approval is determined by the starting point and the nature of the required work.

Fit-out starts from a raw or semi-empty space with the aim of transforming it into a ready-to-use area. This involves constructing essential elements from scratch, such as walls, ceilings, electrical, plumbing, and HVAC systems.

In contrast, renovation approvals begin with an already completed space and aim to update or improve it without compromising the structure, focusing on cosmetic work or simple modifications like changing paint.

Make Your Restaurant Fit-out Approval Effortless — Get Professional Guidance Today

2. How does the degree of structural impact differ between Fit-Out and Renovation on the building’s elements?

The degree of structural impact from a fit-out differs from a renovation based on the size and level of the finishing work. While a fitout permit starts from a raw space and includes constructing internal finishes, adding partitions, and utility systems, it might extend to minor structural modifications such as service openings or additional loading.

Furthermore, its structural impact can be significant when adding a mezzanine within the unit, which requires a building permit and certified drawings like the building’s load plan.

A renovation project, however, starts from an existing space and aims to update or modify it. While it may be limited to superficial changes like flooring replacement, it could involve structural modifications when removing or replacing existing elements such as walls.

Therefore, understanding Dubai fit out regulations is crucial for both types of projects, ensuring smoother interior fitout approvals and transforming design concepts into fully compliant, ready-to-build solutions.

3. What is the difference between the engineering drawings required for a Fit-Out and those required for Renovation?

The difference between the engineering drawings needed for a fit-out and those for a renovation is determined by the starting condition of the site. A fit-out begins from a raw space, and as such, it requires a complete set of drawings detailing everything to be built, such as architectural, electromechanical, and fire safety plans, and sometimes structural plans if there are additional loads or a mezzanine. 

A renovation starts from an existing space, so the drawings are based on the current situation and include Existing/As-Built drawings alongside the proposed modification plans. These are typically only architectural and electrical and do not require structural plans unless the project involves the removal or modification of structural elements such as columns.

Know the Difference… and Plan Your Project Wisely

Whether you are starting from a raw space or updating an existing one, understanding the difference between Fit-Out Approval and a Renovation Permit is the key to your project’s success in Dubai. Each permission has its own scope, diverse engineering requirements, and documentation. Adhering to these from the start ensures a smooth process with the Dubai Municipality and Civil Defence, helping you avoid delays and fines. The correct renovation lecience or permit type is essential.

With DAEM Contracting LLC, you receive comprehensive support: precise preparation of blueprints, assembly of legal documentation, electronic submission of applications, and continuous follow-up with all official authorities.

Frequently Asked Questions:

1. Which type of approval requires more detailed engineering drawings, Fit-Out or Renovation?

Fit-Out approval requires more detailed engineering drawings, including full architectural, MEP, and fire safety plans, whereas Renovation approval generally involves simpler drawings focusing on existing versus proposed layouts.

Renovation approval requires the same level of permits as a fit-out when the renovation affects the building structure, such as wall removal, load increase, or modifications impacting fire safety systems.