How to Get TECOM Approvals in Dubai: A Practical Guide for Project Owners

Do you think obtaining a TECOM approval is just a simple administrative task? Unfortunately, this misconception alone can delay your project by weeks, if not months.

In the world of Dubai’s creative and industrial clusters, there is no room for guesswork. Each zone has its specific mandates, and every project has unique details that dictate the requirements. Whether you are planning a new development, an office fit-out, or renovating a residential space, the path to TECOM approvals is clear but unforgiving of errors.

The process of acquiring TECOM Approvals involves precise identification of approval types, ensuring blueprints comply with the TECOM standards ,This is where partnering with a licensed contracting company becomes invaluable to avoid:

❌Incorrect approval classification ❌Engineering plans that don’t align with TECOM regulations ❌Incomplete documentation or rejection from relevant authorities.

With DAEM Contracting, we transform the TECOM approval process from an administrative burden into a calculated milestone. Discover how we manage the entire journey, from the initial submission to the final execution permit.

Contact Us Now!

Your Project, Our Priority: Fast & Reliable Approvals

📞 WhatsApp

Table of Contents

Key Steps to Secure TECOM Approval

The journey To secure TECOM Approval through zones like (Dubai Internet City, Media City, d3, Knowledge Park, and Dubai Industrial City) begins with defining the scope, such as seeking TECOM approval for construction, this is followed by preparing legal documents (like the contractor appointment letter) and engineering blueprints (architectural drawings) that strictly adhere to the height and area regulations of the cluster.

Once the TECOM developer issues the NOC, the file moves to the Dubai Development Authority for the final DDA Approval. Simultaneously, coordination with external entities is vital, particularly Civil Defense for safety standards like fire alarm systems installation.

📌Do you want a practical guide that will shorten your path? Discover the DAEM guide to TECOM and DCCA approvals in Dubai and start your project with confidence and clarity.

1. Selecting the Right TECOM Approval: Your First Strategic Decision

Tecom approvals include building and construction permits for the Tecom Group to supervise construction work step by step, approvals for office and retail fit-out work, as well as building modifications with regard to the structural integrity of the building.

TECOM Design approvals are also obtained as an essential part of the project work, in addition to building completion approvals such as the BCC building completion certificate.

Choosing the correct TECOM Approval type is essential. Categories include:

  1. RTA Design Approval: Required at the early stages of building projects, covering architectural, structural, and interior facade designs.
  2. RTA Building Permits: Necessary for new structures or structural modifications. These ensure compliance with safety codes and requirements during construction operations such as excavating.
  3. TECOM approvals for fit-out: Specifically for offices and retail units. This involves auditing internal modifications to ensure they meet the DCD Fit Out Approval Requirements.
  4. RTA Renovation Approvals: Covers internal partitioning, change of use, or MEP (Mechanical, Electrical, and Plumbing) modifications.
  5. Completion Certificates: Includes the Building Completion Certificate (BCC), which legally allows the occupancy of the premises.

📌You are within the TECOM Group area and need to protect your office from fire? Learn about fire suppression systems in the UAE and how they work to detect and extinguish fires in various buildings and facilities.

2. Documentation for RTA Approval: Is Your File Submission-Ready?

The documents required to obtain TECOM approval must be prepared, which include the architectural and structural plans of the building, the design of MEP systems plans (such as electrical panel systems), in addition to the fire protection systems for the buildings (such as the fire suppression system).

The following is a list of documents required to obtain approvals from TECOM Group:

  • Architectural and structural blueprints.
  • MEP plans (HVAC, electrical loads).
  • Fire & Safety plans (Fire suppression and alarm systems).
  • Soil test reports (for new constructions).
  • Site plans
  • The Appointment Letter for Consultant and Contractor.
  • A copy of the lease agreement, signed and stamped.

Stop Waiting Start Building.

Trust proven authority approval services in Dubai and Sharjah to keep your project moving without costly setbacks.

3. The Submission Process: Moving to the Approval Phase

The submission to TECOM Approval starts on the online Portal to obtain an NOC from the TECOM Group. This document confirms that your project does not conflict with the master plan or utility infrastructure (Sewage, DEWA, Ventilation). Once secured, the entire file is uploaded to the DDA/DCCA portal.

The following are the steps for submitting a project  TECOM approval application:

  • (NOC) from TECOM Group: As the developer of the area, TECOM Group issues a No Objection Certificate for construction, fitting-out, or modification works to ensure that these works do not conflict with TECOM’s regulations (such as the maximum building height not exceeding 10 floors), the building’s intended use, and shared systems such as the coordination of utility services (sewage, electricity, ventilation).
  • Submitting the official application for project approval: The complete project file, after obtaining the NOC from TECOM Group, is submitted to the Dubai Development Authority (DDA) or DCCA through their online portal, along with the previously prepared documents. The application is then reviewed.

 📌By working with an Authority approvals company like DAEM, you can leverage “Fast Track” approvals  to significantly reduce processing times.

4. Final Approval and Execution Permits

Final project TECOM approval is granted after reviewing the application from a structural and architectural design perspective and ensuring its compliance with building standards in TECOM complexes, such as adhering to approved building heights, verifying safety systems (e.g., fire suppression systems for buildings), and mechanical, electrical, and plumbing (MEP) systems (e.g., sewage systems).

After verifying the documents and plans, the Dubai Development Authority (DDA) issues the final project approval (e.g., for preparation works). Upon completion of construction, a completion certificate and a building completion certificate (BCC) are issued.

In parallel with the DDA issuing the final construction permit, approvals are also required from other relevant authorities (e.g., Dubai Municipality approval, approvals from authorities for MEP systems).

The DDA issues the final permit after verifying structural integrity and urban harmony. Parallel to this, you must secure stamps from other entities:

Seeking a specialized Authority approval company like DAEM Contracting ensures these parallel tracks move in sync, preventing bottlenecks.

📌Does your office project require specific approvals from the DDA? Discover the DAEM Contracting guide on DDA approvals for office projects in Dubai and start implementation without complications.

Expert Tips to Accelerate Your Approval

To obtain TECOM approvals smoothly, you must accurately identify the type of approval your project requires (fit-out, construction, or modification approval), and prepare all the necessary documents for the TECOM approval application, ensuring their accuracy to avoid comments from DDA or TECOM.

Expediting TECOM approval can also be achieved by complying with the design and construction standards in TECOM complexes (such as building heights), coordinating early with relevant authorities (such as Civil Defense), and engaging a reliable contracting and consulting company to ensure the accuracy of the documents and paperwork required for the approval application.

Here is a list of valuable tips to help you get Tecom approvals quickly:

  1. Define The exact TECOM Approval needed: Accurate classification saves weeks of re-submission.
  2. Pre-Audit of all TECOM Approval Docs: Ensure all MEP and architectural plans are cross-checked by engineering consultants before clicking “Submit.”
  3. Adherence to TECOM community regulations:  Regulations for TECOM areas, such as building heights, must be observed. Ignoring these details may lead to the design being rejected.
  4. Early coordination with other relevant authorities: Approvals from relevant authorities, including the Civil Defense, Dubai Municipality, DEWA, ​​and RTA, are often intertwined with TECOM and DDA approvals. Starting these processes in parallel shortens the time required to obtain the final permit.
  5. Partner Up with Professional Consultant and Contractor: Hiring an experienced Approval company like DAEM Contracting ensures that your technical drawings are compliant from the first attempt.

📌Is your project located in one of the TECOM complex areas? Learn about the interior design change permit requirements in Dubai with DAEM Contracting before applying for TECOM approvals.

Why Choosing DAEM Contracting To Secure TECOM Approval

In Dubai’s fast-paced real estate market, TECOM Approval requires more than just submitting papers; it requires technical depth and regulatory foresight. As a leading Engineering approvals company, DAEM Contracting combines technical expertise with a deep understanding of DDA/DCCA protocols:

✔ Technical expertise ✔ Organizational understanding ✔ Preparation of correct documentation ✔ Approved drawings and systems✔ First-time application approval

Whether you are looking for engineering consulting companies  to design your space or Contracting companies to execute the build, we provide a seamless “Design-Build-Approve” experience. We are also recognized among the top engineering consultants in Dubai for managing complex Authority Approval Challenges.

Our Approval services in Dubai are designed to let you focus on your business while we handle the bureaucracy.

Frequently Asked Questions:

1.Can independent freelance engineers design structural plans for TECOM projects?

 No. All structural and architectural designs must be submitted by licensed Consultants and Engineers entities or registered consultants.

 Typically, it takes 6 weeks to 3 months to secure TECOM approval, depending on project scale and document readiness.

 Design standards in TECOM clusters focus on the Dubai Green Building Code, modern aesthetic harmony, and rigorous safety standards approved by Civil Defense.